Underlayment pourable before permanent installation

USG has announced that its Levelrock brand CSD Early Exposure floor underlayment can be poured up to 60 days before a building’s permanent windows and doors are installed in geographic areas not subject to freezing conditions. The limit in areas subject to freezing conditions is 30 days.

Specific requirements must be followed in conjunction with early-exposure underlayment pours.

Levelrock CSD Early Exposure underlayment can be applied at a much lower thickness than pouredin- place concrete, reducing dead load and allowing a greater number of floors per building for increased square footage. Its self-sealing technology typically eliminates the need to seal the underlayment.

? (800) 874-4968
www.levelrock.com

Got more questions about your project?

  • Drop files here or
    Accepted file types: jpeg, jpg, gif, png, pdf, Max. file size: 50 MB.
      Allowed formats: jpeg, jpg, gif, png, pdf
    • How would you like us to respond?

    • Note: Some questions will be published anonymously with their answers at the end of this story to share with other readers.